Clackamas Partnership Project TrackerClackamas Partnership
  • About
    • About the Clackamas Partnership
    • Contracting and Requests For Proposals (RFPs)
    • Partnership Documents
    • TAC and Partnership Meeting Schedules
    • TAC Meeting Agendas and Meeting Packets
    • TAC Meeting Notes
  • Projects
    • Project Map
    • Full Project List
    • Proposals
  • Program Info
    • Limiting Factors
    • Focal Species
    • Project Types
    • Performance Measures
    • Watersheds
    • Organizations
    • Funds
    • Web Services
  • Log In Toggle Dropdown
    • Forgot Password
    • Request Account
  • Help
    • Request Support
    • Training
    • Release Notes
    • About ProjectFirma

Oregon Metro (Metro)

Back to all Organizations
  • Overview
  • Expenditures
  • Accomplishments
Basics
Oregon Metro
Metro
http://www.oregonmetro.gov/

Local
Brian Vaughn - Oregon Metro (Metro)
Yes
Funds
  • Oregon Metro (Metro)
Project Locations and boundary

The map displays the Organization boundary, and the locations of any active Projects and Proposals that have spatial data.

To zoom, hold down Shift and drag a rectangle.
Projects

Oregon Metro is:

  • the Lead Implementer for 3 Projects
  • a contributor to 6 Projects
Currently viewing of Projects associated with Oregon Metro (Metro) (clear filters) Selected rows: Download Table
Proposals

Currently viewing of Proposals associated with Oregon Metro (Metro) (clear filters) Selected rows: Download Table
Users
  • Brian Vaughn

Project Reported Expenditures associated with this Organization are presented in several ways:

  • The Expenditures Provided Directly by this Organization chart shows all Reported Expenditures that originate with Funds owned by this Organization
  • The Expenditures Received from other Organizations chart shows Reported Expenditures received from other Organizations for all Projects where this Organization is the Project Lead Implementer
  • The Project Reported Expenditures table at the bottom of the page provides a list of all Project Reported Expenditures for which this Organization provided or received funding, and the annual expenditure amounts
Provided Directly by this Organization
Reported Expenditures By Fund
  • Enlarge
  • Download Chart Data
Received from Other Organizations

No expenditure data available.

Project Reported Expenditures
Currently viewing of Project Reported Expenditures (clear filters) Selected rows: Download Table

The reported Performance Measure results within this Organization are charted here. Results are included for every Project that is assigned to this Organization. To see the full results for a Performance Measure, click the Performance Measure name in the chart title.

Large Wood Placement
By:
  • Enlarge
  • Download Chart Data
  • Enlarge
  • Download Chart Data

: 7,614.00 lf

Off-Channel Wetland Area Increase
By: Inundation frequency
  • Enlarge
  • Download Chart Data

: 52,272.00 sq ft

Riparian / Floodplain Invasive Species Removal Area
By: Side of stream / river
  • Enlarge
  • Download Chart Data

: 109.50 acres

Riparian / Floodplain Native Planting Area
By: Side of stream / river
  • Enlarge
  • Download Chart Data

: 58.30 acres

Side Channel Habitat Increase
By: Inundation frequency
  • Enlarge
  • Download Chart Data

: 1,150.00 lf

Stream Habitat Accessible
Cumulative:
  • Enlarge
  • Download Chart Data
  • Enlarge
  • Download Chart Data

: 1.50 miles

ProjectFirma is a service provided by Sitka Technology Group, which builds on the Tahoe Regional Planning Agency's EIP Project Tracker. This program is free software; you can redistribute it and/or modify it under the terms of the GNU Affero General Public License as published by the Free Software Foundation. Source code is available on GitHub.

Copyright (C) 2020 Tahoe Regional Planning Agency and Sitka Technology Group | Version 1.2.131.0 | Compiled 2021-02-11 18:08:03 | PID 15016